Absolute accuracy when setting out buildings or infrastructure is crucial. Our experienced and dedicated site engineers ensure that all setting out is implemented with precision and efficiency, using a combination of Leica robotic total stations and GPS equipment.
Ensuring we have the most up-to-date version of a site plan and that the building coordinates are calculated correctly and uploaded onto our Leica Total Stations – rather than calculated by hand – helps safeguard against human error and guarantees accuracy. The proposed site layout is based on the same grid as the original topographical survey. From this we can extract coordinates for the building corners. Using an electronic theodolite referenced to existing site control, we can then peg out the required corners.
As the contracts Manager for MC Construction, I’m responsible for overseeing several sites and schemes at once, and I am also involved in the design development. For MC Construction to be able to help Royal Mail develop this existing site, we needed a lot of vital underground information on the location. Powers were able to provide us with an underground utility survey, that was clear and accurate, enabling us to be able to place the Hydrobrake in the most efficient position and excavate the car park, without putting our team and others in danger.
Need a quote or some more information? Call 01928 734 473 or send us a message via the form.
* INDICATES REQUIRED FIELD